Town of Wilbur
2024 Street Maintenance
Multiple Locations
TIB Award Amount
$31,476
Region: East   |   Legislative District: 9   |   Length: 0.00 mi. FY 2025 Small City Maintenance Program (SCMP)

Existing Conditions

Many streets are in need of crack sealing to prevent further deterioration

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 31,476 0 31,476
Project Totals $31,476 $0 $31,476

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

Crack Sealing, 1/4 cracks, Mastic repair for wider cracks, Pavement repair for potholes