Region: West | Legislative District: 19 | Length: 0.00 mi. | FY 2025 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsCracking of asphalt pavement and some pot holes |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 47,500 | 2,500 | 50,000 |
Project Totals | $47,500 | $2,500 | $50,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Sealing cracks and minor patching of pot holes and areas that are too cracked up.