Region: East | Legislative District: 12 | Length: 0.00 mi. | FY 2025 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsAppoximately 57,000 LF of cracking exists on the street network. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 81,225 | 4,275 | 85,500 |
Project Totals | $81,225 | $4,275 | $85,500 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
The proposed solution is to have certain streets crack sealed.