Region: West | Legislative District: 19 | Length: 0.05 mi. | FY 2026 Small City Arterial Program (SCAP) |
![]() |
Existing ConditionsThe existing concrete roadway has been cut and is broken in many places, resulting in an uneven driving surface. The existing walkway on the westerly side of the road is uneven and only 4 feet wide in some places. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 36,506 | 0 | 36,506 |
Right of Way | 25,000 | 0 | 25,000 |
Construction | 279,881 | 0 | 279,881 |
Project Totals | $341,387 | $0 | $341,387 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
The roadway will be rebuilt in its current location. The existing extruded curb on the easterly side of the road will be replaced with curb gutter. The existing curb and walkway on the westerly side of the road will be replaced with curb gutter and accessible sidewalks and driveway entrances. Minor storm drainage improvements will be added to direct runoff to the existing system.