Region: West   |   Legislative District: 10   |   Length: 0.23 mi. FY 2025 Small City Arterial Program (SCAP)

Existing Conditions

The proposed project includes the reconstruction of approximately 1,200 feet of Saratoga Road, using full-depth reclamation from DeBruyn Ave to city limits. The community needs this roadway to be reconstructed because of the condition of the asphalt and the common usage of Saratoga Road to leave the city heading west.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 540,000 28,670 568,670
Project Totals $540,000 $28,670 $568,670

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

The solution is to demolish the existing roadway and rebuild it using full-depth reclamation practices. Cement will be applied to the pulverized materials for reinforcement.