Region: West | Legislative District: 19 | Length: 0.14 mi. | FY 2025 Small City Arterial Program (SCAP) |
![]() |
Existing ConditionsA field investigation has concluded that NW Arden Avenue is in poor condition and requires reconstruction in order to ensure safe and efficient transportation. NW Arden Ave is a highly utilized road that provides access between the citys two bridges as well as the school and residential district. Existing sidewalks are underutilized due to the existing cross section placing them too close to homes, causing vehicles to park over the sidewalk. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 104,500 | 5,500 | 110,000 |
Right of Way | 0 | 0 | 0 |
Construction | 709,576 | 37,347 | 746,923 |
Project Totals | $814,076 | $42,847 | $856,923 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
The cross section is being redesigned to narrow the existing section. The sidewalk will be moved away from homes, allowing room for off-street parking without overhang on the sidewalk. Full reconstruction will provide a new pavement surface.