City of Winlock
NW Arden Avenue
NW Fir St to W Walnut St
TIB Award Amount
$814,076
Region: West   |   Legislative District: 19   |   Length: 0.14 mi. FY 2025 Small City Arterial Program (SCAP)

Existing Conditions

A field investigation has concluded that NW Arden Avenue is in poor condition and requires reconstruction in order to ensure safe and efficient transportation. NW Arden Ave is a highly utilized road that provides access between the citys two bridges as well as the school and residential district. Existing sidewalks are underutilized due to the existing cross section placing them too close to homes, causing vehicles to park over the sidewalk.

Project Funding

  TIB Funds Local Funds Total Costs
Design 104,500 5,500 110,000
Right of Way 0 0 0
Construction 709,576 37,347 746,923
Project Totals $814,076 $42,847 $856,923

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

The cross section is being redesigned to narrow the existing section. The sidewalk will be moved away from homes, allowing room for off-street parking without overhang on the sidewalk. Full reconstruction will provide a new pavement surface.