Region: East | Legislative District: 12 | Length: 0.46 mi. | FY 2024 Small City Arterial Program (SCAP) |
![]() |
Existing ConditionsRoadway is too narrow, has severe structural defects, and has inadequate sight distances. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 14,993 | 113,400 | 128,393 |
Right of Way | 0 | 0 | 0 |
Construction | 167,527 | 1,267,086 | 1,434,613 |
Project Totals | $182,520 | $1,380,486 | $1,563,006 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
11.7% | 88.3% | 0% |
Full reconstruction of roadway to include widening for safety shoulders, sight distance correction, striping, guardrail and provide stormwater drainage.