Region: Puget Sound | Legislative District: 2 | Length: 0.25 mi. | FY 2023 Small City Arterial Program (SCAP) |
![]() |
Existing ConditionsCarter Street W roadway is in poor condition and existing ADA ramps are not compliant. Carter Street W is identified as part of the Eatonville School Districts Safe Walking Path and connects to the Towns elementary and high schools. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 47,241 | 5,249 | 52,490 |
Right of Way | 0 | 0 | 0 |
Construction | 362,907 | 40,323 | 403,230 |
Project Totals | $410,148 | $45,572 | $455,720 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 5% |
This project will perform full depth reclamation of Carter Street W between Antonie Ave N and Orchard Ave N and a HMA overlay strpping and upgrade ADA ramps to current standards.