City of Medical Lake
Lake Street
Lefevre St (SR 902) to Prentis St
TIB Award Amount
$199,092
Region: East   |   Legislative District: 6   |   Length: 0.45 mi. FY 2021 Small City Arterial Program (SCAP)

Existing Conditions

This is a grind and inlay project outside of the typical funds for the SCPP. The roadway has aligator, longitudinal, and traverse cracking. This roadway is the second highest traveled road in Medical Lake (aside from SR 902, and a lot of those vehicles are pass-through vehicles). The roadway has 'No Vehicle Parking' lanes on each side of the traffic lanes (essentially act as bike lanes) and residents in the communtiy use these facilities daily. The community needs the road repaired to continue to use it.

Project Funding

  TIB Funds Local Funds Total Costs
Design 21,185 1,115 22,300
Right of Way 0 0 0
Construction 177,907 9,363 187,270
Project Totals $199,092 $10,478 $209,570

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

Some areas of the roadway may need digout repairs accomplished; however, these are anticipated to be relatively minor as the roadway was properly constructed some 20-25 years ago with 8" base course, 4" top course and 4" of HMA. Upon repairing any soft/bad areas, the traffic lanes and bike lanes shall be milled (ground) 2" and an inlay of new Cl. 1/2" HMA (2" in depth) placed and compacted. Striping shall be painted upon completion.