Region: East | Legislative District: 16 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsThe current condition of Rose Street between Ash Ave. and Carey Ct. is dark, and the lighting will help increase visibility, safety and reduce petty crimes. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 215,354 | 23,928 | 239,282 |
Right of Way | 67,389 | 7,488 | 74,877 |
Construction | 1,542,949 | 171,439 | 1,714,388 |
Project Totals | $1,825,692 | $202,855 | $2,028,547 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
The project will illuminate and improve the safety of the multiuse path and sidewalks along the NE Rose Street corridor from College Ave to Carey Court.