Region: East | Legislative District: 7 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsOlder infrastructure throughout the cooridor that needs to be replaced. Town's primary commercial street. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 274,590 | 26,310 | 300,900 |
Right of Way | 91,256 | 8,744 | 100,000 |
Construction | 2,238,373 | 214,470 | 2,452,843 |
Project Totals | $2,604,219 | $249,524 | $2,853,743 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
91.3% | 8.7% | 5% |
The project enhances downtown with ADA sidewalks, streetscape amenities, traffic calming, bike infrastructure, and canopy replacements, following the disturbance of the funded water line replacement.