Region: Puget Sound | Legislative District: 5 | Length: 2,050.00 ft. | FY 2025 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsThers is a 2050 ft of missing gap in facilities along SR 516. Tahoma High School is located immediate south of project, pedestrian access to school campus and athletic events complex is within project limit. The school and other community destinations have generated great amount of non-motorized users along this stretch of SR 516. Pedestrian access is currently consist of 3-5 ft paved shoulder with limited sight distance on a 40 mph state highway carrying heavy traffic and truck volumes. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 85,660 | 21,415 | 107,075 |
Right of Way | 0 | 0 | 0 |
Construction | 656,723 | 164,182 | 820,905 |
Project Totals | $742,383 | $185,597 | $927,980 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
80.0% | 20.0% | 20% |
This project will complete the non-motorized facility gap section to include a 10 ft shared-used path on south side of SR 516 separated by a paved shoulder, curbs and gutter, and 5 ft buffer strip. The buffer strip will be used for stormwater bio-swales, adds ADA ramps, and adds signage.