Region: Puget Sound | Legislative District: 44 | Length: 112.00 ft. | FY 2025 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsPuget Park Drive is a 25 mph urban major collector. The raised crosswalks at 67th Ave SE and at 72nd DR SE provide direct access to the large pedestrian generating park adjacent to Puget Park Drive. The curves in the road and vegetation limits the visibility and awareness of pedestrians. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 16,608 | 8,942 | 25,550 |
Right of Way | 0 | 0 | 0 |
Construction | 179,306 | 96,550 | 275,856 |
Project Totals | $195,914 | $105,492 | $301,406 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
65.0% | 35.0% | 20% |
This project will install RRFB and crosswalkimprovements will bring awareness to drivers of pedestrians crossing Puget Park Drive at 67th Ave SE and Sno Cascade Dr. Vegetation removal and installation of an RRFB at the two raised crosswalks will bring further visibility and awareness of pedestrians crossing.