Snohomish County
Puget Park Drive RRFBs
Various
TIB Award Amount
$195,914
Region: Puget Sound   |   Legislative District: 44   |   Length: 112.00 ft. FY 2025 Urban Active Transportation Program (ATP)

Existing Conditions

Puget Park Drive is a 25 mph urban major collector. The raised crosswalks at 67th Ave SE and at 72nd DR SE provide direct access to the large pedestrian generating park adjacent to Puget Park Drive. The curves in the road and vegetation limits the visibility and awareness of pedestrians.

Project Funding

  TIB Funds Local Funds Total Costs
Design 16,608 8,942 25,550
Right of Way 0 0 0
Construction 179,306 96,550 275,856
Project Totals $195,914 $105,492 $301,406

Local Match

TIB Participation Local Match Minimum Local Match
65.0% 35.0% 20%

Description of Improvements

This project will install RRFB and crosswalkimprovements will bring awareness to drivers of pedestrians crossing Puget Park Drive at 67th Ave SE and Sno Cascade Dr. Vegetation removal and installation of an RRFB at the two raised crosswalks will bring further visibility and awareness of pedestrians crossing.