City of North Bend
SR202 Sidewalk Gap
North Bend Way to RR Tracks
TIB Award Amount
$133,820
Region: Puget Sound   |   Legislative District: 12   |   Length: 110.00 ft. FY 2025 Urban Active Transportation Program (ATP)

Existing Conditions

The existing sidewalk along SR 202 between North Bend Way and the RR Tracks is 29 inches wide and does not meet ADA requirements.

Project Funding

  TIB Funds Local Funds Total Costs
Design 15,440 2,725 18,165
Right of Way 0 0 0
Construction 118,379 20,891 139,270
Project Totals $133,820 $23,615 $157,435

Local Match

TIB Participation Local Match Minimum Local Match
85.0% 15.0% 15%

Description of Improvements

This project replaces the existing narrow sidewalk along SR 202 between North Bend Way and the RR Tracks with an ADA compliant 8-foot sidewalk, curb and gutter.