Region: Puget Sound | Legislative District: 12 | Length: 110.00 ft. | FY 2025 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsThe existing sidewalk along SR 202 between North Bend Way and the RR Tracks is 29 inches wide and does not meet ADA requirements. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 15,440 | 2,725 | 18,165 |
Right of Way | 0 | 0 | 0 |
Construction | 118,379 | 20,891 | 139,270 |
Project Totals | $133,820 | $23,615 | $157,435 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
This project replaces the existing narrow sidewalk along SR 202 between North Bend Way and the RR Tracks with an ADA compliant 8-foot sidewalk, curb and gutter.