Region: East | Legislative District: 12 | Length: 6,238.00 ft. | FY 2025 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsThe majority of the Chelan's lake front commercial businesses are located between Downtown Chelan and the Lakeside Park on US97A generating high multimodal use and need. This section of US97A has minimal active transportation facilities and minimal parking for lake front commercial businesses. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 500,000 | 3,102,414 | 3,602,414 |
Project Totals | $500,000 | $3,102,414 | $3,602,414 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
13.9% | 86.1% | 10% |
Multimodal trail connecting non-motorized users to the lakeside business located on US97A and the Central Business District. This project will also modify six existing transit stops.