Town of Eatonville
West Eatonville Sidewalk Improvements
Multiple Locations
TIB Award Amount
$399,076
Region: Puget Sound   |   Legislative District: 2   |   Length: 4,553.00 ft. FY 2025 Urban Active Transportation Program (ATP)

Existing Conditions

The main pedestrian traffic routes between west Eatonville and the high, middle and grade schools and to the central business area, there are several obstructions and trip hazards that make it difficult for pedestrians to walk. Specifically, there are areas with cracked sidewalks, objects blocking walking paths and non-compliant ADA ramps.

Project Funding

  TIB Funds Local Funds Total Costs
Design 48,450 2,550 51,000
Right of Way 0 0 0
Construction 350,626 18,454 369,080
Project Totals $399,076 $21,004 $420,080

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

This project will replace old curb ramps with ADA-compliant curb ramps, replace cracked sidewalks and driveways. In addition, remove obstructions such as relocating a mailbox that is limiting the walkable width of the sidewalk, and remove trees and vegetation that are causing the surrounding infrastructure to be displaced or are causing obstructions.