City of Elma
W Main Street ADA
16th St to 18th St
TIB Award Amount
$434,720
Region: West   |   Legislative District: 24   |   Length: 820.00 ft. FY 2025 Urban Active Transportation Program (ATP)

Existing Conditions

West Main Street is a main pedestrian corridor connecting to the City of Elma Middle and High Schools. Many of the curb ramps along West Main Street, between 14th Street and 18th Street are not ADA compliant and are missing crosswalks. There is a need to improve safety along this section. In addition, Main Street is an asphalt concrete pavement roadway with a pavement condition rating (PCR) between 50 to 63 (poor) between 14th Street and 18th Street and there is a need to improve the pavement condition along this section.

Project Funding

  TIB Funds Local Funds Total Costs
Design 50,160 2,640 52,800
Right of Way 0 0 0
Construction 384,560 20,240 404,800
Project Totals $434,720 $22,880 $457,600

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

Pedestrian safety along West Main Street can be improved by removing and reinstalling existing curb ramps to current ADA standards and installing crosswalks between 18th Street and 16th Street.