Region: West | Legislative District: 24 | Length: 820.00 ft. | FY 2025 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsWest Main Street is a main pedestrian corridor connecting to the City of Elma Middle and High Schools. Many of the curb ramps along West Main Street, between 14th Street and 18th Street are not ADA compliant and are missing crosswalks. There is a need to improve safety along this section. In addition, Main Street is an asphalt concrete pavement roadway with a pavement condition rating (PCR) between 50 to 63 (poor) between 14th Street and 18th Street and there is a need to improve the pavement condition along this section. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 50,160 | 2,640 | 52,800 |
Right of Way | 0 | 0 | 0 |
Construction | 384,560 | 20,240 | 404,800 |
Project Totals | $434,720 | $22,880 | $457,600 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Pedestrian safety along West Main Street can be improved by removing and reinstalling existing curb ramps to current ADA standards and installing crosswalks between 18th Street and 16th Street.