Region: Puget Sound | Legislative District: 48 | Length: 2,550.00 ft. | FY 2025 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsNE 24th Street between Evergreen Point Rd and 84th Ave has 17 non-compliant ADA ramps. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 31,185 | 3,465 | 34,650 |
Right of Way | 0 | 0 | 0 |
Construction | 239,085 | 26,565 | 265,650 |
Project Totals | $270,270 | $30,030 | $300,300 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
This project replaces 17 existing ramps with ADA compliant ramps along NE 24th Street between Evergreen Point Rd and 84th Avenue.