Region: Puget Sound | Legislative District: 39 | Length: 960.00 ft. | FY 2024 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsStanley Street is the main east-west corridor through the City. Previous projects, funded by both the City and Developers, have installed sidewalks on both sides of the street from Jordan Road to Alder Avenue with the exception of two gaps on the north side of Stanley Street. The gaps include Jordan Road to the west side of the O Reilly Auto Parts frontage improvements (approximately 500 feet) and from the east side of the O Reilly Auto Parts frontage improvements to east of the Napa Auto Parts store (approximately 460 feet). Closing these gaps will complete the pedestrian facilities through the core of the City. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 39,704 | 2,096 | 41,800 |
Right of Way | 0 | 0 | 0 |
Construction | 456,696 | 24,104 | 480,800 |
Project Totals | $496,400 | $26,200 | $522,600 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Install new cement concrete curb, gutter and sidewalks on the north side of Stanley Street to fill in the gaps in the existing sidewalk system.