City of Sedro Woolley
Cascade Trail West Extension Phase 2A
Holtcamp Rd to Hodgin St
TIB Award Amount
$326,000
Region: West   |   Legislative District: 39   |   Length: 2,900.00 ft. FY 2024 Urban Active Transportation Program (ATP)

Project Information

Agency Name City of Sedro Woolley
Funding Year FY 2024
Program ATP
Legislative District 39
Congressional District 2, 1
Federal Route Number 0020
Project Length 2,900 ft.
ADT 17,000
Functional Class Principal
Type of Work
Project Contact David Lee
Contact Email dlee@sedro-woolley.gov

Project Schedule

Milestone Target Date
Start Design Engineering  
Contract Advertisement 07/02/2019
Contract Award 07/12/2024
Contract Completion 09/01/2024

Existing Conditions

This project will improve the capacity of SR 20 by providing an additional 0.57 miles of separated path that will allow bicyclists and pedestrians travelling on US Bike Route 10 between the United General Hospital vicinity (Holtcamp Road with this Phase 2A, and later Collins Road with Phase 2B) to connect to the existing 2.65 miles of shared use paths within Sedro-Woolley between Hodgin Road and North Fruitdale Road.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 81,000 81,000
Right of Way 0 0 0
Construction 326,000 453,000 779,000
Project Totals $326,000 $534,000 $860,000

Local Match

TIB Participation Local Match Minimum Local Match
37.9% 62.1% 15%

Description of Improvements

Install an 8 to 10 wide pedestrian and bicycle path along the north side of SR 20 and along north side of Brickyard Creek where the creek parallels SR 20. Completely separating the non-motorized traffic will improve safety and capacity for SR 20 in this vicinity. While no bicycle or pedestrian collisions were recorded in this route segment for the past three years, this segment has a high accident rate 39 vehicles involved in 21 accidents with 5 injuries due to the 50 mph two-lane configuration, with driveways and roads entering the route in close proximity to Brickyard Creek. Brickyard Creek parallels SR 20 and is located immediately off the north shoulder of the roadway for much of the distance of Phase 2A.