| Region: Puget Sound | Legislative District: 31 | Length: 1,340.00 ft. | FY 2024 Urban Active Transportation Program (ATP) |
| Agency Name | City of Enumclaw |
| Funding Year | FY 2024 |
| Program | ATP |
| Legislative District | 31 |
| Congressional District | 8 |
| Federal Route Number | 8000 |
| Project Length | 1,340 ft. |
| ADT | 550 |
| Functional Class | MInor |
| Type of Work | |
| Project Contact | Lance Talmadge |
| Contact Email | ltalmadge@ci.enumclaw.wa.us |
| Milestone | Target Date |
|---|---|
| Start Design Engineering | |
| Contract Advertisement | 10/01/2022 |
| Contract Award | 02/01/2023 |
| Contract Completion | 11/01/2023 |
![]() |
Existing ConditionsMultiple sidewalk gaps exist around the City. Gaps are primarily located in between recent or new developments on parcels that are not anticipated to develop in the new future. The community needs these gaps filled to provide contiguous sidewalk routes for pedestrian access. |
| TIB Funds | Local Funds | Total Costs | |
|---|---|---|---|
| Design | 0 | 0 | 0 |
| Right of Way | 0 | 0 | 0 |
| Construction | 330,504 | 58,324 | 388,828 |
| Project Totals | $330,504 | $58,324 | $388,828 |
| TIB Participation | Local Match | Minimum Local Match |
|---|---|---|
| 85.0% | 15.0% | 15% |
The project will fill five gaps in the Enumclaw sidewalk system.