| Region: East | Legislative District: 9 | Length: 990.00 ft. | FY 2024 Urban Active Transportation Program (ATP) |
| Agency Name | City of Ritzville |
| Funding Year | FY 2024 |
| Program | ATP |
| Legislative District | 9 |
| Congressional District | 4 |
| Federal Route Number | |
| Project Length | 990 ft. |
| ADT | 550 |
| Functional Class | Collector |
| Type of Work | |
| Project Contact | Scott Yaeger |
| Contact Email | scotty@co.adams.wa.us |
| Milestone | Target Date |
|---|---|
| Start Design Engineering | |
| Contract Advertisement | 02/12/2023 |
| Contract Award | 03/20/2024 |
| Contract Completion | 09/30/2024 |
![]() |
Existing ConditionsThe sidewalk on 6th Ave is in dire need of replacement in most locations. This sidewalk is the main walking route to the Ritzville Grade School and the Lind-Ritzville High School. There are currently no ADA ramps at the intersection of Columbia or Palouse. |
| TIB Funds | Local Funds | Total Costs | |
|---|---|---|---|
| Design | 59,597 | 3,321 | 62,918 |
| Right of Way | 0 | 0 | 0 |
| Construction | 426,057 | 23,740 | 449,797 |
| Project Totals | $485,655 | $27,060 | $512,715 |
| TIB Participation | Local Match | Minimum Local Match |
|---|---|---|
| 94.7% | 5.3% | 5% |
The project replaces the existing sidewalks and adds ADA ramps at the required intersection. The project also addresses obstructions, such as trees.