|
|
||||
Region: Northwest | Legislative District: 24 | Length: 0.00 mi. | FY 2026 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 48,296 | 16,098 | 64,394 |
Right of Way | 0 | 0 | 0 |
Construction | 482,952 | 160,984 | 643,936 |
Project Totals | $531,248 | $177,082 | $708,330 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
75.0% | 25.0% | 15% |
2 inch grind and overlay