Region: Puget Sound | Legislative District: 44 | Length: 0.00 mi. | FY 2025 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 4,250 | 750 | 5,000 |
Right of Way | 0 | 0 | 0 |
Construction | 451,103 | 79,607 | 530,710 |
Project Totals | $455,353 | $80,357 | $535,710 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
Grind and 2-inch overlay of Avenue D - 2nd St to 175 ft s/o 10th St