Region: Northwest | Legislative District: 24 | Length: 0.00 mi. | FY 2025 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 30,839 | 16,667 | 47,506 |
Right of Way | 0 | 0 | 0 |
Construction | 709,309 | 383,334 | 1,092,643 |
Project Totals | $740,149 | $400,000 | $1,140,149 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
64.9% | 35.1% | 15% |
2 inch grind and overlay