Region: Puget Sound | Legislative District: 10 | Length: 0.00 mi. | FY 2025 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 11,050 | 1,950 | 13,000 |
Right of Way | 0 | 0 | 0 |
Construction | 621,073 | 109,602 | 730,675 |
Project Totals | $632,123 | $111,552 | $743,675 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
Grind and 2-inch overlay of the following segments: 72nd Avenue NW - 265th St NW to Pioneer Hwy with 5 ADA ramps 284th Street NW - 68th Ave NW to Copper Station Development with 4 ADA ramps