City of Stanwood
2024 Overlay
Multiple Locations
TIB Award Amount
$632,123
Region: Puget Sound   |   Legislative District: 10   |   Length: 0.00 mi. FY 2025 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 11,050 1,950 13,000
Right of Way 0 0 0
Construction 621,073 109,602 730,675
Project Totals $632,123 $111,552 $743,675

Local Match

TIB Participation Local Match Minimum Local Match
85.0% 15.0% 15%

Description of Improvements

Grind and 2-inch overlay of the following segments: 72nd Avenue NW - 265th St NW to Pioneer Hwy with 5 ADA ramps 284th Street NW - 68th Ave NW to Copper Station Development with 4 ADA ramps