Region: Northwest | Legislative District: 39 | Length: 0.00 mi. | FY 2025 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 12,750 | 2,250 | 15,000 |
Right of Way | 0 | 0 | 0 |
Construction | 464,528 | 81,976 | 546,504 |
Project Totals | $477,278 | $84,226 | $561,504 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
2 inch overlay