Region: Puget Sound | Legislative District: 30 | Length: 0.00 mi. | FY 2025 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 205,955 | 22,916 | 228,871 |
Right of Way | 0 | 0 | 0 |
Construction | 1,401,315 | 155,917 | 1,557,232 |
Project Totals | $1,607,270 | $178,833 | $1,786,103 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Grind and 2-inch overlay of Ellingson Road between West Valley Highway and UPRR with 11 ADA ramp upgrades.