|
|
||||
Region: Southwest | Legislative District: 20 | Length: 0.00 mi. | FY 2025 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 60,300 | 6,700 | 67,000 |
Right of Way | 0 | 0 | 0 |
Construction | 563,400 | 62,600 | 626,000 |
Project Totals | $623,700 | $69,300 | $693,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
2 inch grind and overlay