Region: Southwest | Legislative District: 20 | Length: 0.00 mi. | FY 2025 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 72,972 | 8,108 | 81,080 |
Right of Way | 0 | 0 | 0 |
Construction | 559,422 | 62,158 | 621,580 |
Project Totals | $632,394 | $70,266 | $702,660 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
2-inch HMA grind and overlay