|
|
||||
Region: Southwest | Legislative District: 19 | Length: 0.00 mi. | FY 2024 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 475,000 | 93,643 | 568,643 |
Project Totals | $475,000 | $93,643 | $568,643 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
83.5% | 16.5% | 15% |
2 inch grind and overlay