Region: Puget Sound | Legislative District: 44 | Length: 0.00 mi. | FY 2024 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 4,250 | 750 | 5,000 |
Right of Way | 0 | 0 | 0 |
Construction | 420,749 | 74,251 | 495,000 |
Project Totals | $424,999 | $75,001 | $500,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
This project grinds and provides a 2-inch overlay of 10th Street between Avenue D and Maple Ave