Region: Puget Sound | Legislative District: 39 | Length: 0.00 mi. | FY 2024 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 92,128 | 39,484 | 131,612 |
Right of Way | 0 | 0 | 0 |
Construction | 706,317 | 302,708 | 1,009,025 |
Project Totals | $798,446 | $342,191 | $1,140,637 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
70.0% | 30.0% | 15% |
This project grinds and provides a 2-inch overlay of the following segments: Blueberry Lane - 182nd Ave to N Kelsey St NB Freylands Boulevard - Wales St SE to Tye St SE City will cover the costs of the upgrade of 16 ADA ramps