| Region: Puget Sound | Legislative District: 45 | Length: 0.00 mi. | FY 2024 Arterial Preservation Program (APP) |
| Agency Name | City of Duvall |
| Funding Year | FY 2024 |
| Program | APP |
| Legislative District | 45 |
| Congressional District | 1 |
| Federal Route Number | |
| Project Length | 0.00 mi. |
| ADT | 0 |
| Functional Class | |
| Type of Work | |
| Project Contact | Benjamin Ressler |
| Contact Email | benjamin.ressler@duvallwa.gov |
| Milestone | Target Date |
|---|---|
| Start Design Engineering | |
| Contract Advertisement | |
| Contract Award | 06/01/2023 |
| Project Complete | 08/31/2023 |
![]() |
Existing Conditions |
| TIB Funds | Local Funds | Total Costs | |
|---|---|---|---|
| Design | 0 | 0 | 0 |
| Right of Way | 0 | 0 | 0 |
| Construction | 399,500 | 70,500 | 470,000 |
| Project Totals | $399,500 | $70,500 | $470,000 |
| TIB Participation | Local Match | Minimum Local Match |
|---|---|---|
| 85.0% | 15.0% | 15% |
This project grinds, patches and provides a 2 inch overlay, striping and ADA curb ramp retrofits of the follow segments Cherry Valley Road - SR 203 to C/L - 2 ADA Ramps Big Rock Road - SR 203 to Pavt Change - 4 ADA Ramps