Region: Puget Sound | Legislative District: 28 | Length: 0.00 mi. | FY 2024 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 84,103 | 9,345 | 93,448 |
Right of Way | 0 | 0 | 0 |
Construction | 594,367 | 66,041 | 660,408 |
Project Totals | $678,471 | $75,385 | $753,856 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
This project grinds and provides a 2-inch overlay of the southbound lanes of Orchard Street 24 feet of pavement Orchard Street - Holly Dr to Center St upgrade 7 ADA Ramps