|
|
||||
Region: Northwest | Legislative District: 40 | Length: 0.00 mi. | FY 2024 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 49,333 | 8,712 | 58,045 |
Right of Way | 0 | 0 | 0 |
Construction | 542,666 | 95,829 | 638,495 |
Project Totals | $592,000 | $104,540 | $696,540 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
2 inch overlay