|
|
||||
Region: Northwest | Legislative District: 10 | Length: 0.00 mi. | FY 2024 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 485,297 | 85,641 | 570,938 |
Project Totals | $485,297 | $85,641 | $570,938 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
2 inch grind and overlay