Region: Southeast | Legislative District: 15 | Length: 0.00 mi. | FY 2024 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 53,631 | 5,959 | 59,590 |
Right of Way | 0 | 0 | 0 |
Construction | 470,291 | 52,254 | 522,545 |
Project Totals | $523,922 | $58,213 | $582,135 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
0.17 depth full width (32) grind and overlay for 1,650 linear feet. Includes the replacement of non compliant curb ramps, utility adjustments, crack sealing, pavement repair, and prelevel. W Fifth Street - Euclid Ed to Ave E Elm Street - Bonnieview Rd to Wine Country Rd