Region: Puget Sound | Legislative District: 39 | Length: 0.00 mi. | FY 2021 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 40,500 | 4,500 | 45,000 |
Right of Way | 0 | 0 | 0 |
Construction | 393,236 | 43,693 | 436,929 |
Project Totals | $433,736 | $48,193 | $481,929 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
The city will overlay the existing asphalt with 2" of HMA and bring up the shoulder with 2" of CTB.