|
|
||||
Region: Northwest | Legislative District: 40 | Length: 0.00 mi. | FY 2021 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 8,381 | 1,619 | 10,000 |
Right of Way | 0 | 0 | 0 |
Construction | 261,619 | 50,531 | 312,150 |
Project Totals | $270,000 | $52,150 | $322,150 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
83.8% | 16.2% | 15% |
2" overlay, minor edge grinding.