Region: Puget Sound | Legislative District: 1 | Length: 0.00 mi. | FY 2021 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 34,675 | 6,119 | 40,794 |
Right of Way | 0 | 0 | 0 |
Construction | 367,542 | 64,861 | 432,403 |
Project Totals | $402,217 | $70,980 | $473,197 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
This project grinds and provides a 2-inch overlay of the following segments: 228th Street SW - Brier Road to East C/L 228th Street SW - West C/L to 38th Pl W