Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/14/2024 Audit 0.00 0.00 0.00 0.00 0.00 0.00 28,858.00 28,858.00
2 10/15/2024 Audit 0.00 0.00 0.00 0.00 0.00 0.00 871.00 871.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 29,729.00 29,729.00