Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/22/2021 Payment 0.00 0.00 0.00 0.00 0.00 0.00 25,729.98 25,729.98
2 07/12/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 22,636.93 22,636.93
3 12/03/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 6,633.35 6,633.35
4 03/12/2025 Payment 0.00 0.00 0.00 0.00 0.00 0.00 3,658.03 3,658.03
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 58,658.29 58,658.29