Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/26/2024 Payment 0.00 0.00 22,957.58 0.00 0.00 0.00 0.00 22,957.58
2 03/19/2025 Payment 0.00 0.00 -267.42 0.00 0.00 0.00 111,805.73 111,538.31
3 09/02/2025 Audit 0.00 0.00 15,609.74 0.00 24,406.80 0.00 66,413.57 106,430.11
TOTAL PAYMENTS 0.00 0.00 38,299.90 0.00 24,406.80 0.00 178,219.30 240,926.00