Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 05/02/2024 Payment 0.00 0.00 0.00 0.00 1,903.69 0.00 0.00 1,903.69
2 12/06/2024 Payment 0.00 0.00 0.00 0.00 6,396.50 0.00 17,124.83 23,521.33
3 01/31/2025 Payment 0.00 0.00 0.00 0.00 17,303.85 2,700.96 231,512.01 251,516.82
4 03/24/2025 Payment 0.00 0.00 0.00 0.00 2,550.60 0.00 20,367.85 22,918.45
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 28,154.64 2,700.96 269,004.69 299,860.29