Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 03/22/2024 Payment 0.00 0.00 833.98 0.00 0.00 0.00 0.00 833.98
2 09/27/2024 Payment 0.00 0.00 0.00 0.00 0.00 25,249.95 0.00 25,249.95
3 12/30/2024 Audit 0.00 0.00 -833.98 0.00 0.00 0.24 65,964.81 65,131.07
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 25,250.19 65,964.81 91,215.00