Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/07/2025 Payment 0.00 0.00 281.54 0.00 712.00 0.00 0.00 993.54
2 04/22/2025 Payment 0.00 0.00 531.23 0.00 4,822.14 0.00 48,937.65 54,291.02
TOTAL PAYMENTS 0.00 0.00 812.77 0.00 5,534.14 0.00 48,937.65 55,284.56