Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/10/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 7,378.11 7,378.11
2 11/13/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 50,377.17 50,377.17
3 12/16/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 4,891.10 4,891.10
4 04/01/2025 Audit 0.00 0.00 0.00 0.00 0.00 0.00 -7,778.38 -7,778.38
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 54,868.00 54,868.00