Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 01/29/2024 Payment 0.00 0.00 0.00 0.00 0.00 13,407.48 224,820.22 238,227.70
2 05/14/2024 Payment 0.00 0.00 0.00 0.00 0.00 5,619.13 2,632.57 8,251.70
3 06/03/2024 Audit 0.00 0.00 0.00 0.00 19,026.72 -19,026.61 9,200.49 9,200.60
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 19,026.72 0.00 236,653.28 255,680.00