Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/13/2024 Payment 0.00 0.00 38,830.76 0.00 0.00 0.00 0.00 38,830.76
2 10/18/2024 Payment 0.00 0.00 24,739.71 0.00 14,376.78 0.00 0.00 39,116.49
3 11/07/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 207,332.64 207,332.64
4 01/14/2025 Audit 0.00 0.00 -4,321.13 0.00 21,073.60 0.00 106,495.64 123,248.11
TOTAL PAYMENTS 0.00 0.00 59,249.34 0.00 35,450.38 0.00 313,828.28 408,528.00